Quick answers
What is Proposed Expansion in Construction of Industrial Buildings?
Proposed Expansion in Construction of Industrial Buildings is a lapsed building project in Anjur, Chengalpattu, Tamil Nadu. The site covers 9.3 acres.
Who is building it?
The applicant is Parker Hannifin India Private Limited.
Has it been approved?
No. The application was lapsed on 20 Mar 2026, so it is no longer under consideration.
Where is it?
In Anjur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹253 crore and a site of 9.3 acres.
When was it filed?
The application was filed on 7 Oct 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Mar 2026 |
| Application filed | 7 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Parker Hannifin India Private Limited |
| Land area | 9.3 acres (3.8 ha) |
| Project cost | ₹253 crore |
| Village / locality | Anjur |
| Taluk / tehsil | Chengalpattu |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03962 |
In context
302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.3 acres, this one is smaller than 54% of them.
50 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anjur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Expansion by Addition of Premium Metal… — initial checks, 300 m away
- Environmental Clearance for Proposed Expansion of the Existing Metal Inert Gas… — environmental approval granted, 300 m away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — under environmental review, 550 m away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — environmental approval granted, 550 m away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — cleared for impact study, 550 m away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — returned to applicant, 550 m away
- Proposed Expansion to Construction of Industrial Building — environmental approval granted, 1.1 km away
- Anjur Village Ordinary Earth Mining Project — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.