What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Chengalpattu, Tamil Nadu

Environmental Clearance for Proposed Expansion of the Existing Metal Inert Gas (MIG) Wire and Submerged Arc Wire (SAW) Manufacturing unit with addition of Flux at Mahindra World City Developers Ltd.- Industrial Park, Village-Anjur, Taluk-Chengalpattu, District- Chengalpattu, Tamil Nadu, India by Lincoln Electric Company (India) Private Limited

Environmental Clearance for Proposed Expansion of the Existing Metal Inert Gas (MIG) Wire and Submerged Arc Wire (SAW) Manufacturing unit with addition of Flux at Mahindra World City Developers Ltd.- Industrial Park, Village-Anjur, Taluk-Chengalpattu, District- Chengalpattu, Tamil Nadu, India by Lincoln Electric Company (India) Private Limited is an approved industrial building project in Anjur, Chengalpattu, Tamil Nadu. It plans 2 towers of up to 2 floors on 14.2 acres. Its stated project cost is ₹186.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Jan 2026).

See it on the live map All projects in Chengalpattu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Proposed Expansion of the Existing Metal Inert Gas (MIG) Wire and Submerged Arc Wire (SAW) Manufacturing unit with addition of Flux at Mahindra World City Developers Ltd.- Industrial Park, Village-Anjur, Taluk-Chengalpattu, District- Chengalpattu, Tamil Nadu, India by Lincoln Electric Company (India) Private Limited is an approved industrial building project in Anjur, Chengalpattu, Tamil Nadu. It plans 2 towers of up to 2 floors on 14.2 acres.

Who is building it?

The applicant is Lincoln Electric Company (India) Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 5 Jan 2026), as of 27 Nov 2026.

Where is it?

In Anjur, Chengalpattu, Tamil Nadu.

How big is it?

It has a stated cost of ₹186.2 crore and a site of 14.2 acres.

When was it filed?

The application was filed on 5 Jan 2026.

Project details

StatusEnvironmental approval granted
Status since5 Jan 2026
Application filed5 Jan 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantLincoln Electric Company (India) Private Limited
UseIndustrial
Towers2
Floors (tallest)2
Height23 m
Land area14.2 acres (5.8 ha)
Built-up area23,291 m² (2,50,702 sq ft)
Plot area57,505 m² (6,18,978 sq ft)
Project cost₹186.2 crore
Village / localityAnjur
Taluk / tehsilChengalpattu
DistrictChengalpattu
StateTamil Nadu
Location fromSite boundary on record
Our referenceWID-TN-04493

In context

302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 14.2 acres, this one is larger than 61% of them.

50 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Anjur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Lincoln Electric Company (India) Private Limited in Chengalpattu

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.