Quick answers
What is Anjur Village Ordinary Earth Mining Project?
Anjur Village Ordinary Earth Mining Project is an approved mining project in Anjur, Chengalpattu, Tamil Nadu. The site covers 3.7 acres.
Who is building it?
The applicant is Thirukumaran Ganesh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Mar 2026), as of 27 Nov 2026.
Where is it?
In Anjur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹2 lakh and a site of 3.7 acres.
When was it filed?
The application was filed on 30 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Mar 2026 |
| Application filed | 30 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Thirukumaran Ganesh |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Anjur |
| Taluk / tehsil | Chengalpattu |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04449 |
In context
168 applications in Chengalpattu since January 2022 are in the same category (Mining): 127 approved, 17 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.7 acres, this one is smaller than 89% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Anjur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Anjur Ordinary Earth quarry Project — environmental approval granted, 550 m away
- Proposed Expansion to Construction of Industrial Building — environmental approval granted, 550 m away
- Environmental Clearance for Proposed Expansion by Addition of Premium Metal… — initial checks, 1.1 km away
- Environmental Clearance for Proposed Expansion of the Existing Metal Inert Gas… — environmental approval granted, 1.1 km away
- Proposed Expansion in Construction of Industrial Buildings — lapsed, 1.2 km away
- Laying of Aerial Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 1.3 km away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — under environmental review, 1.7 km away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — environmental approval granted, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.