Quick answers
What is this project?
Environmental Clearance for Proposed Expansion by Addition of Premium Metal Inert Gas (MIG) Wire Manufacturing and enhancing production capacity of Existing Metal Inert Gas (MIG) Wire, Submerged Arc Wire (SAW) and Flux Manufacturing Unit within the existing plant located in Mahindra World City Developers Ltd. Industrial Park, Village Anjur, Taluk and District Chengalpattu, Tamil Nadu is a proposed building project in Anjur, Chengalpattu, Tamil Nadu. The site covers 14.2 acres.
Who is building it?
The applicant is Lincoln Electric Company (India) Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Anjur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹321 crore and a site of 14.2 acres.
When was it filed?
The application was filed on 16 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 16 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Lincoln Electric Company (India) Private Limited |
| Land area | 14.2 acres (5.8 ha) |
| Project cost | ₹321 crore |
| Village / locality | Anjur |
| Taluk / tehsil | Chengalpattu |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04464 |
In context
302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 14.2 acres, this one is larger than 61% of them.
50 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anjur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Expansion of the Existing Metal Inert Gas… — environmental approval granted, 0 m away
- Proposed Expansion in Construction of Industrial Buildings — lapsed, 300 m away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — under environmental review, 800 m away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — environmental approval granted, 800 m away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — cleared for impact study, 800 m away
- Building project by M/s. Mahindra & Mahindra Limited, Mahindra Research Valley — returned to applicant, 800 m away
- Proposed Expansion to Construction of Industrial Building — environmental approval granted, 850 m away
- Anjur Village Ordinary Earth Mining Project — environmental approval granted, 1.1 km away
More from Lincoln Electric Company (India) Private Limited in Chengalpattu
- Environmental Clearance for Proposed Expansion of the Existing Metal Inert Gas… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.