One of 2 filings for this project. The project's main page, with every filing and where each stands: Standalone Cement Grinding Unit with Cement (OPC & PPC) Production Capacity of 1.08 MTPA
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 5 Mar 2025 |
| Application filed | 5 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Zuari Cement Limited |
| Land area | 28.9 acres (11.7 ha) |
| Project cost | ₹19.8 crore |
| Village / locality | Attippattu |
| Taluk / tehsil | Ponneri |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04111 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 29 Aug 2025 | Cleared for impact study | 28.9 acres | ₹31.4 crore |
| Early planning filed 5 Feb 2025 (this page) | Cleared for impact study | 28.9 acres | ₹19.8 crore |
In context
56 applications in Thiruvallur since January 2022 are in the same category (Industry): 32 approved, 19 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 28.9 acres, this one is larger than 63% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Attippattu, Ponneri, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Kattupalli Port Expansion: A ₹2,566-Crore Upgrade for Thiruvallur, Tamil Nadu (6.9 km away).
Other projects nearby
- Standalone Cement Grinding Unit with Cement (OPC & PPC) Production Capacity of… — cleared for impact study, 0 m away
- EC & CRZ amendment for laying of ash slurry and recovery water pipelines from… — returned to applicant, 1.2 km away
- 'NIPL' Certification for Proposed Modification & Process Optimisation for… — initial checks, 2.3 km away
- EC & CRZ Amendment for the revised route alignment of seawater pipelines and… — withdrawn, 2.4 km away
- EC & CRZ Amendment for the revised route alignment of seawater pipelines and… — returned to applicant, 2.4 km away
- Expansion in cement production capacity of Standalone Grinding Unit from EC… — lapsed, 2.4 km away
- Expansion in cement production capacity of Standalone Grinding Unit from EC… — cleared for impact study, 2.4 km away
- 1x 800 MW NCTPP Stage III by M/s. TNPGCL (Erstwhile TANGEDCO) — lapsed, 2.8 km away
All 6 Zuari Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.