Quick answers
What is this project?
Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in Existing Co Gen Power Capacity – 26.0 MW Existing Industry Premises is a proposed industrial project in Dahiaki, Roorkee, Hardwar, Uttarakhand. The site covers 55.4 acres.
Who is building it?
The applicant is Uttam Sugar Mills Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Feb 2023), as of 27 Nov 2026.
Where is it?
In Dahiaki, Roorkee, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹208 crore and a site of 55.4 acres.
When was it filed?
The application was filed on 21 Feb 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in Existing Co…
Project details
| Official title | Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in Existing Co Gen Power Capacity – 26.0 MW Existing Industry Premises at Village- Dahiyaki, Khundi, Kulchandi, Mundiaki, Tehsil-Roorkee & District– Haridwar, Uttarakhand |
|---|---|
| Status | Cleared for impact study |
| Status since | 21 Feb 2023 |
| Application filed | 21 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttam Sugar Mills Limited |
| Land area | 55.4 acres (22.4 ha) |
| Project cost | ₹208 crore |
| Village / locality | Dahiaki |
| Taluk / tehsil | Roorkee |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00216 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 Nov 2023 | Environmental approval granted | 55.4 acres | ₹208 crore |
| Early planning filed 21 Feb 2023 (this page) | Cleared for impact study | 55.4 acres | ₹208 crore |
In context
22 applications in Hardwar since January 2022 are in the same category (Industry): 17 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 55.4 acres, this one is larger than 91% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dahiaki, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Distillery Expansion of Distillery capacity from 62.5… — environmental approval granted, 100 m away
- Expansion of Distillery capacity from 62.5 KLD To 72.5 KLD through addition of… — cleared for impact study, 100 m away
- Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in… — environmental approval granted, 200 m away
- No Increase in Pollution Load for Proposed Change in product Mix for… — initial checks, 900 m away
- Diversion of Forest land for Road Safety Improvement of Critical junction on… — forest land use approved, 5 km away
- Approach road to Reliance BP Mobility Limited Petrolpump on Meerut to Haridwar… — more information requested, 7.1 km away
- Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products… — environmental approval granted, 10.7 km away
- Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products… — cleared for impact study, 10.7 km away
More from Uttam Sugar Mills Limited in Hardwar
- Expansion of existing Distillery Expansion of Distillery capacity from 62.5… — environmental approval granted
- Expansion of Distillery capacity from 62.5 KLD To 72.5 KLD through addition of… — cleared for impact study
4 Uttam Sugar Mills projects in Hardwar
All 8 Uttam Sugar Mills projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.