Quick answers
What is this project?
Expansion of Distillery capacity from 62.5 KLD To 72.5 KLD through addition of 10 KLD Malt/ Cane Juice Based Distillery Plant without change in Co-Gen Power - 3.0 MW within existing premises is a proposed industrial project in Kulchand, Roorkee, Hardwar, Uttarakhand. The site covers 14.8 acres.
Who is building it?
The applicant is Uttam Sugar Mills Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 Jul 2024), as of 27 Nov 2026.
Where is it?
In Kulchand, Roorkee, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹119.4 crore and a site of 14.8 acres.
When was it filed?
The application was filed on 31 May 2024.
Project details
| Official title | Expansion of Distillery capacity from 62.5 KLD To 72.5 KLD through addition of 10 KLD Malt/ Cane Juice Based Distillery Plant without change in Co-Gen Power - 3.0 MW within existing premises at Village: -Khundi Libberheri, Tehsil: – Roorkee, District: - Haridwar, Uttarakhand of M/S Uttam Sugar Mills Limited, (Distillery Division). |
|---|---|
| Status | Cleared for impact study |
| Status since | 30 Jul 2024 |
| Application filed | 31 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uttam Sugar Mills Limited |
| Land area | 14.8 acres (6 ha) |
| Project cost | ₹119.4 crore |
| Village / locality | Kulchand |
| Taluk / tehsil | Roorkee |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00460 |
In context
22 applications in Hardwar since January 2022 are in the same category (Industry): 17 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 14.8 acres, this one is larger than 55% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kulchand, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Distillery Expansion of Distillery capacity from 62.5… — environmental approval granted, 0 m away
- Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in… — environmental approval granted, 100 m away
- Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in… — cleared for impact study, 100 m away
- No Increase in Pollution Load for Proposed Change in product Mix for… — initial checks, 1 km away
- Diversion of Forest land for Road Safety Improvement of Critical junction on… — forest land use approved, 4.9 km away
- Approach road to Reliance BP Mobility Limited Petrolpump on Meerut to Haridwar… — more information requested, 7.2 km away
- Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products… — environmental approval granted, 10.6 km away
- Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products… — cleared for impact study, 10.6 km away
More from Uttam Sugar Mills Limited in Hardwar
- Expansion of existing Distillery Expansion of Distillery capacity from 62.5… — environmental approval granted
- Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in… — environmental approval granted
- Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in… — cleared for impact study
4 Uttam Sugar Mills projects in Hardwar
All 8 Uttam Sugar Mills projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.