Quick answers
What is this project?
No Increase in Pollution Load for Proposed Change in product Mix for Production of additional Product Glue and Adhesive within Existing Production Capacity without Increasing Pollution Load by M/s Jesons Industries Limited (Unit - V) is a proposed industrial project in Mundiaki, Roorkee, Hardwar, Uttarakhand. The site covers 1.6 acres.
Who is building it?
The applicant is M/S. Jesons Industries LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Mundiaki, Roorkee, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹70 lakh and a site of 1.6 acres.
When was it filed?
The application was filed on 8 Oct 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 8 Oct 2024 |
| Application filed | 8 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | M/S. Jesons Industries LTD |
| Land area | 1.6 acres (0.7 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Mundiaki |
| Taluk / tehsil | Roorkee |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00453 |
In context
22 applications in Hardwar since January 2022 are in the same category (Industry): 17 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 1.6 acres, this one is smaller than 91% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mundiaki, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in… — cleared for impact study, 900 m away
- Expansion of existing Distillery Expansion of Distillery capacity from 62.5… — environmental approval granted, 1 km away
- Expansion of Distillery capacity from 62.5 KLD To 72.5 KLD through addition of… — cleared for impact study, 1 km away
- Proposed Expansion of Sugar Unit From 6250 Tcd to 8000 Tcd Without Change in… — environmental approval granted, 1 km away
- Diversion of Forest land for Road Safety Improvement of Critical junction on… — forest land use approved, 5.7 km away
- Approach road to Reliance BP Mobility Limited Petrolpump on Meerut to Haridwar… — more information requested, 6.6 km away
- Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products… — environmental approval granted, 11.6 km away
- Proposed Expansion in Manufacturing of M.S. Billets and Rolling Mills products… — cleared for impact study, 11.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.