What is Developing? Open the mapMap

Environmental approval grantedMining · Hardwar, Uttarakhand

Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.2920 Ha from a part of river bed Village- Fatehullahpur (Telpura), Tehsil- Bhagwanpur, District-Haridwar, State: Uttarakhand by Sh. Jameel Ahmad S/o Sh. Majid

Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.2920 Ha from a part of river bed Village- Fatehullahpur (Telpura), Tehsil- Bhagwanpur, District-Haridwar, State: Uttarakhand by Sh. Jameel Ahmad S/o Sh. Majid is an approved mining project in Telpura, Roorkee, Hardwar, Uttarakhand. The site covers 3.2 acres. Its stated project cost is ₹5 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 Sept 2025).

See it on the live map All projects in Hardwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.2920 Ha from a part of river bed Village- Fatehullahpur (Telpura), Tehsil- Bhagwanpur, District-Haridwar, State: Uttarakhand by Sh. Jameel Ahmad S/o Sh. Majid is an approved mining project in Telpura, Roorkee, Hardwar, Uttarakhand. The site covers 3.2 acres.

Who is building it?

The applicant is Jameel Ahmed.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 28 Sept 2025), as of 27 Nov 2026.

Where is it?

In Telpura, Roorkee, Hardwar, Uttarakhand.

How big is it?

It has a stated cost of ₹5 lakh and a site of 3.2 acres.

When was it filed?

The application was filed on 12 Aug 2025.

Project details

StatusEnvironmental approval granted
Status since28 Sept 2025
Application filed12 Aug 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantJameel Ahmed
Land area3.2 acres (1.3 ha)
Project cost₹5 lakh
Village / localityTelpura
Taluk / tehsilRoorkee
DistrictHardwar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00558

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 Aug 2025 (this page)Environmental approval granted3.2 acres₹5 lakh
New project filed 22 Feb 2025Under wildlife review3.2 acres₹5 lakh

In context

61 applications in Hardwar since January 2022 are in the same category (Mining): 28 approved, 23 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.2 acres, this one is smaller than 85% of them.

No other mining lease on record is within 500 m of this site; 17 have applied within 5 km.

Where it is

Telpura, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jameel Ahmed in Hardwar

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.