Quick answers
What is this project?
Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.2920 Ha from a part of river bed Village- Fatehullahpur (Telpura), Tehsil- Bhagwanpur, District-Haridwar, State: Uttarakhand by Sh. Jameel Ahmad S/o Sh. Majid is a proposed building project in Telpura, Roorkee, Hardwar, Uttarakhand. The site covers 3.2 acres.
Who is building it?
The applicant is Jameel Ahmed.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Telpura, Roorkee, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹5 lakh and a site of 3.2 acres.
When was it filed?
The application was filed on 22 Feb 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.2920 Ha from…
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 22 Feb 2025 |
| Application filed | 22 Feb 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jameel Ahmed |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Telpura |
| Taluk / tehsil | Roorkee |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-02241 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Aug 2025 | Environmental approval granted | 3.2 acres | ₹5 lakh |
| New project filed 22 Feb 2025 (this page) | Under wildlife review | 3.2 acres | ₹5 lakh |
In context
31 applications in Hardwar since January 2022 are in the same category (Buildings & townships): 8 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. At 3.2 acres, this one is smaller than 90% of them.
35 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Telpura, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of… — environmental approval granted, 0 m away
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of… — more information requested, 0 m away
- Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no… — under wildlife review, 2 km away
- Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no… — environmental approval granted, 2 km away
- Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no… — cleared for impact study, 2 km away
- Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River at At Khata no… — withdrawn, 2 km away
- Budhwashaheed-IV Sand, Bajri and Boulders Mining in Sukhro River At Gata no… — environmental approval granted, 2.3 km away
- Budhwashaheed-IV Sand, Bajri and Boulders Mining in Sukhro River At Gata no… — under wildlife review, 2.3 km away
More from Jameel Ahmed in Hardwar
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.