Quick answers
What is this project?
Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.2920 Ha from a part of riverbed by Sh. Jameel Ahmed S/o Sf. Majid is a proposed building project in Telpura, Roorkee, Hardwar, Uttarakhand. The site covers 3.2 acres.
Who is building it?
The applicant is Jameel Ahmed.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Telpura, Roorkee, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹5 lakh and a site of 3.2 acres.
When was it filed?
The application was filed on 13 Nov 2024.
Project details
| Official title | Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of 1.2920 Ha from a part of riverbed at Village- Fatehullahpur (Telpura), Tehsil- Bhagwanpur, District-Haridwar, State: Uttarakhand by Sh. Jameel Ahmed S/o Sf. Majid |
|---|---|
| Status | More information requested |
| Status since | 13 Nov 2024 |
| Application filed | 13 Nov 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jameel Ahmed |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Telpura |
| Taluk / tehsil | Roorkee |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-02125 |
In context
31 applications in Hardwar since January 2022 are in the same category (Buildings & townships): 8 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. At 3.2 acres, this one is smaller than 90% of them.
36 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Telpura, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of… — environmental approval granted, 0 m away
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of… — under wildlife review, 0 m away
- Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no… — under wildlife review, 2 km away
- Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no… — environmental approval granted, 2 km away
- Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River At Khata no… — cleared for impact study, 2 km away
- Budhwashaheed-I Sand, Bajri and Boulders Mining in Modaro River at At Khata no… — withdrawn, 2 km away
- Budhwashaheed-IV Sand, Bajri and Boulders Mining in Sukhro River At Gata no… — environmental approval granted, 2.3 km away
- Budhwashaheed-IV Sand, Bajri and Boulders Mining in Sukhro River At Gata no… — under wildlife review, 2.3 km away
More from Jameel Ahmed in Hardwar
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of… — environmental approval granted
- Proposed RBM (Sand, Bajri, Boulders etc.) Mining Project over an area of… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.