WithdrawnMining · Udham Singh Nagar, Uttarakhand

Proposed Sand, Silt & RBM Deposit in Phica River Khasra No. 436 Village- Puranpur, Tehsil-Jaspur&, District- Udham Singh Nagar, State- Uttarakhand Area: 1.50 Ha

Proposed Sand, Silt & RBM Deposit in Phica River Khasra No. 436 Village- Puranpur, Tehsil-Jaspur&, District- Udham Singh Nagar, State- Uttarakhand Area: 1.50 Ha is a withdrawn mining project in Puranpur, Jaspur, Udham Singh Nagar, Uttarakhand. The site covers 3.7 acres. Its stated project cost is ₹15 lakh. As of 27 Nov 2026, its status is “Withdrawn” (since 21 Sept 2025).

See it on the live map All projects in Udham Singh Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand, Silt & RBM Deposit in Phica River Khasra No. 436 Village- Puranpur, Tehsil-Jaspur&, District- Udham Singh Nagar, State- Uttarakhand Area: 1.50 Ha is a withdrawn mining project in Puranpur, Jaspur, Udham Singh Nagar, Uttarakhand. The site covers 3.7 acres.

Who is building it?

The applicant is Kailash River Bed Minerals LLP.

Has it been approved?

No. The application was withdrawn on 21 Sept 2025, so it is no longer under consideration.

Where is it?

In Puranpur, Jaspur, Udham Singh Nagar, Uttarakhand.

How big is it?

It has a stated cost of ₹15 lakh and a site of 3.7 acres.

When was it filed?

The application was filed on 21 Sept 2025.

Project details

StatusWithdrawn
Status since21 Sept 2025
Application filed21 Sept 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantKailash River Bed Minerals LLP
Land area3.7 acres (1.5 ha)
Project cost₹15 lakh
Village / localityPuranpur
Taluk / tehsilJaspur
DistrictUdham Singh Nagar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00751

In context

96 applications in Udham Singh Nagar since January 2022 are in the same category (Mining): 70 approved, 13 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 32 days from filing to approval. At 3.7 acres, this one is smaller than 59% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 13.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Puranpur, Jaspur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Kailash River Bed Minerals LLP in Udham Singh Nagar

39 Kailash River Bed Minerals projects in Udham Singh Nagar
All 142 Kailash River Bed Minerals projects across India

About this information