What is Developing? Open the mapMap

Environmental approval grantedIndustry · Udham Singh Nagar, Uttarakhand

Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by M/s Shiv Hari Plywood Pvt. Ltd

Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by M/s Shiv Hari Plywood Pvt. Ltd is an approved industrial project in Rehmapur, Jaspur, Udham Singh Nagar, Uttarakhand. The site covers 2.8 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Sept 2025).

See it on the live map All projects in Udham Singh Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by M/s Shiv Hari Plywood Pvt. Ltd is an approved industrial project in Rehmapur, Jaspur, Udham Singh Nagar, Uttarakhand. The site covers 2.8 acres.

Who is building it?

The applicant is Shiv Hari Plywood Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 1 Sept 2025), as of 27 Nov 2026.

Where is it?

In Rehmapur, Jaspur, Udham Singh Nagar, Uttarakhand.

How big is it?

It has a stated cost of ₹60 lakh and a site of 2.8 acres.

When was it filed?

The application was filed on 26 Jun 2025.

Project details

Official titleProposed Synthetic Resin Production Plant of Laminate Manufacturing Unit at Village Rehmapur, Thakurdwara Road, Tehsil Jaspur, District: Udham Singh Nagar, Uttarakhand- 244712 by M/s Shiv Hari Plywood Pvt. Ltd.
StatusEnvironmental approval granted
Status since1 Sept 2025
Application filed26 Jun 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantShiv Hari Plywood Private Limited
Land area2.8 acres (1.2 ha)
Project cost₹60 lakh
Village / localityRehmapur
Taluk / tehsilJaspur
DistrictUdham Singh Nagar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00779

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 26 Jun 2025 (this page)Environmental approval granted2.8 acres₹60 lakh
New project filed 2 May 2025Environmental approval granted2.8 acres₹60 lakh
Early planning filed 31 Jan 2024Cleared for impact study2.8 acres₹60 lakh

In context

50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 2.8 acres, this one is smaller than 78% of them.

Where it is

Rehmapur, Jaspur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Shiv Hari Plywood projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.