Quick answers
What is this project?
Proposed Sand, Bajri & Boulder (RBM) Mining Khasra No. 50, Village- Hajiro, Tehsil- Jaspur, District- Udham Singh Nagar, State: Uttarakhand, Area: 4.50 Ha,Project Proponent: M/s Kailash River Bed Minerals LLP is a proposed building project in Hajiro, Jaspur, Udham Singh Nagar, Uttarakhand. The site covers 11.1 acres.
Who is building it?
The applicant is Kailash River Bed Minerals LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Hajiro, Jaspur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹45 lakh and a site of 11.1 acres.
When was it filed?
The application was filed on 26 Nov 2025.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 26 Nov 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kailash River Bed Minerals LLP |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Hajiro |
| Taluk / tehsil | Jaspur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-02188 |
In context
10 applications in Udham Singh Nagar since January 2022 are in the same category (Buildings & townships): 8 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. At 11.1 acres, this one is larger than 50% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hajiro, Jaspur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hajiro Sand bajri Boulder RBM Mining Project — environmental approval granted, 0 m away
- जनपद ऊधमसिंह नगर के अन्तर्गत ग्राम सीपका, मिलक सीपका एवं मनोरथपुर तृतीय को… — under forest review, 4.2 km away
- Sand, Silt & (River Bed Material) Deposit At Phica River Khasra No. 463 मि0.,… — environmental approval granted, 6 km away
- Proposed Sand, Silt, & (River Bed Material) Deposit at Phica River Khasra no.… — environmental approval granted, 6.7 km away
- Proposed Sand, Silt & RBM Deposit in Phica River Khasra No. 436 Village-… — withdrawn, 6.9 km away
- Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by… — environmental approval granted, 10 km away
- Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by… — environmental approval granted, 10 km away
- Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by… — cleared for impact study, 10 km away
More from Kailash River Bed Minerals LLP in Udham Singh Nagar
- Proposed Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No… — under environmental review
- Laxmipur-2 Sand, Bajri and Boulders Mining located at Khasra no 270 मिन,… — initial checks
- Laxmipur-3 Sand, Bajri and Boulders Mining at Kosi River located at Khasra no… — initial checks
- Ukrauli Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No.… — initial checks
- Laximpur Sand, Bajri & Boulder Mining Project — initial checks
- Sadhu Nagar Sand, Bajri and Boulders Mining in Kailash River At Khasra no.… — initial checks
39 Kailash River Bed Minerals projects in Udham Singh Nagar
All 142 Kailash River Bed Minerals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.