Quick answers
What is this project?
Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by M/s Shiv Hari Plywood Pvt. Ltd is a proposed industrial project in Rehmapur, Jaspur, Udham Singh Nagar, Uttarakhand. The site covers 2.8 acres.
Who is building it?
The applicant is Shiv Hari Plywood Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 1 Feb 2024), as of 27 Nov 2026.
Where is it?
In Rehmapur, Jaspur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹60 lakh and a site of 2.8 acres.
When was it filed?
The application was filed on 31 Jan 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by M/s Shiv…
Project details
| Official title | Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit at Village Rehmapur, Thakurdwara Road, Tehsil Jaspur, District: Udham Singh Nagar, Uttarakhand- 244712 by M/s Shiv Hari Plywood Pvt. Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 1 Feb 2024 |
| Application filed | 31 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shiv Hari Plywood Private Limited |
| Land area | 2.8 acres (1.2 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Rehmapur |
| Taluk / tehsil | Jaspur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00462 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 26 Jun 2025 | Environmental approval granted | 2.8 acres | ₹60 lakh |
| New project filed 2 May 2025 | Environmental approval granted | 2.8 acres | ₹60 lakh |
| Early planning filed 31 Jan 2024 (this page) | Cleared for impact study | 2.8 acres | ₹60 lakh |
In context
50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 2.8 acres, this one is smaller than 78% of them.
Where it is
Rehmapur, Jaspur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by… — environmental approval granted, 0 m away
- Proposed Synthetic Resin Production Plant of Laminate Manufacturing Unit by… — environmental approval granted, 0 m away
- Proposed Sand, Silt & RBM Deposit in Phica River Khasra No. 436 Village-… — withdrawn, 6.2 km away
- Sand, Silt & (River Bed Material) Deposit At Phica River Khasra No. 463 मि0.,… — environmental approval granted, 6.5 km away
- Proposed Sand, Silt, & (River Bed Material) Deposit at Phica River Khasra no.… — environmental approval granted, 6.5 km away
- Production Capacity Enhancement of Existing Paper Machine [pm3] (Manufacturing… — initial checks, 8.8 km away
- Amalgamation & Expansion of Multiply Board/Coated Paper Machine (Pm3) From 400… — lapsed, 8.8 km away
- Proposed Sand, Bajri & Boulder (RBM) Mining Khasra No. 50, Village- Hajiro,… — under wildlife review, 10 km away
All 3 Shiv Hari Plywood projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.