What is Motidhar Paniyala Pumping water supply scheme?
Motidhar Paniyala Pumping water supply scheme is a lapsed pipeline project in Motidhar, Dehradun, Uttarakhand. The site covers 2.7 acres.
Who is building it?
The applicant is Construction Division Uttarakhand Peyjal Nigam Mussoorie.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Motidhar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹7.6 crore; a site of 2.7 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 24 Feb 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 24 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Construction Division Uttarakhand Peyjal Nigam Mussoorie |
| Land area | 2.7 acres (1.1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹7.6 crore |
| Village / locality | Motidhar |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01059 |
In context
7 applications in Dehradun since January 2022 are in the same category (Pipelines): 0 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Motidhar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Motidhar Paniyala Pumping Water Supply Scheme — more information requested, 0 m away
- Link Road from Masrana near of KM 179 of NH 707A to Motidhar in Distt. Dehradun — lapsed, 1.5 km away
- Link Road from Masrana near of KM 179 of NH 707A to Motidhar in Distt. Dehradun — more information requested, 1.5 km away
- Seeking for Prior Approval of the Central Govt. Under Section 2 (1) of the Van… — lapsed, 4.1 km away
- Seeking for prior approval of the Central Govt. under Section 2 (1) of the VAn… — lapsed, 4.1 km away
- जनपद देहरादून मसूरी नगर पालिका क्षेत्रान्तर्गत निजी वन घोषित मैरी विले स्टेट… — lapsed, 4.1 km away
- Environmental Clearance for the Proposed Hotel, Resort & Residential Villa… — under environmental review, 4.3 km away
- Environmental Clearance for the Proposed Hotel, Resort & Residential Villa… — under environmental review, 4.3 km away
More from Construction Division Uttarakhand Peyjal Nigam Mussoorie in Dehradun
- Subhas Nagar Bharuwala, Grant water supply scheme — lapsed
- Mussoorie Sewerage Scheme(Camel back Zone STP) — lapsed
- Motidhar Paniyala Pumping Water Supply Scheme — more information requested
- Krishna Nagar Water Supply Scheme — lapsed
All 5 Construction Division Uttarakhand Peyjal Nigam Mussoorie projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.