Quick answers
What is Motidhar Paniyala Pumping Water Supply Scheme?
Motidhar Paniyala Pumping Water Supply Scheme is a proposed water and irrigation project in Chamasari, Dehradun, Uttarakhand. The site covers 2.7 acres.
Who is building it?
The applicant is Construction Division Uttarakhand Peyjal Nigam Mussoorie.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chamasari, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹7.6 crore; a site of 2.7 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 3 Apr 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 21 Aug 2026 |
| Application filed | 3 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Construction Division Uttarakhand Peyjal Nigam Mussoorie |
| Land area | 2.7 acres (1.1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹7.6 crore |
| Village / locality | Chamasari |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01893 |
In context
16 applications in Dehradun since January 2022 are in the same category (Water & irrigation): 5 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2.8 years from filing to approval. At 2.7 acres, this one is larger than 67% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chamasari, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Motidhar Paniyala Pumping water supply scheme — lapsed, 0 m away
- Link Road from Masrana near of KM 179 of NH 707A to Motidhar in Distt. Dehradun — lapsed, 1.5 km away
- Link Road from Masrana near of KM 179 of NH 707A to Motidhar in Distt. Dehradun — more information requested, 1.5 km away
- Seeking for Prior Approval of the Central Govt. Under Section 2 (1) of the Van… — lapsed, 4.1 km away
- Seeking for prior approval of the Central Govt. under Section 2 (1) of the VAn… — lapsed, 4.1 km away
- जनपद देहरादून मसूरी नगर पालिका क्षेत्रान्तर्गत निजी वन घोषित मैरी विले स्टेट… — lapsed, 4.1 km away
- Environmental Clearance for the Proposed Hotel, Resort & Residential Villa… — under environmental review, 4.3 km away
- Environmental Clearance for the Proposed Hotel, Resort & Residential Villa… — under environmental review, 4.3 km away
More from Construction Division Uttarakhand Peyjal Nigam Mussoorie in Dehradun
- Subhas Nagar Bharuwala, Grant water supply scheme — lapsed
- Mussoorie Sewerage Scheme(Camel back Zone STP) — lapsed
- Motidhar Paniyala Pumping water supply scheme — lapsed
- Krishna Nagar Water Supply Scheme — lapsed
All 5 Construction Division Uttarakhand Peyjal Nigam Mussoorie projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.