Quick answers
What is "Ordinary Sand Mining" at Ganga River Bed?
"Ordinary Sand Mining" at Ganga River Bed is a proposed mining project in Gogaon, Mirzapur, Uttar Pradesh. The site covers 12.4 acres.
Who is building it?
The applicant is Vijay Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Nov 2022), as of 27 Nov 2026.
Where is it?
In Gogaon, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.9 crore and a site of 12.4 acres.
When was it filed?
The application was filed on 17 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Mining" at Ganga River Bed
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Nov 2022 |
| Application filed | 17 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vijay Singh |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹1.9 crore |
| Village / locality | Gogaon |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00141 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Aug 2023 | Environmental approval granted | 12.4 acres | ₹1.9 crore |
| Early planning filed 17 Nov 2022 (this page) | Cleared for impact study | 12.4 acres | ₹1.9 crore |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.4 acres, this one is larger than 95% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Gogaon, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" at Ganga River Bed — environmental approval granted, 0 m away
- Proposed project of Ordinary Sand Mining project at Gata No.- 2/3, Area- 5.0… — cleared for impact study, 14 km away
- Riverbed Ordinary Sand Mine, (on the Riverbed of Ganga River) Village- Nadini… — environmental approval granted, 14.1 km away
- Riverbed Ordinary Sand Mine, (on the Riverbed of Ganga River) Village- Nadini… — cleared for impact study, 14.1 km away
- Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga… — environmental approval granted, 14.5 km away
- Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga… — cleared for impact study, 14.5 km away
- "Building Stone Sand Stone" Project at Gata No.- 615ka & 615/692 Mi , Village-… — environmental approval granted, 19.5 km away
- "Building Stone Sand Stone" Project at Gata No.- 615ka & 615/692 Mi , Village-… — cleared for impact study, 19.5 km away
More from Vijay Singh in Mirzapur
- Sand Stone Quartizite Ballast Gitti Mininig Project of Village - Lahaura,… — environmental approval granted
- Proposed Sonbarsa Building Stone (Sandstone) Mining Project — environmental approval granted
- Mining of Minor Mineral Building Stone (Sand stone) Mining Project — environmental approval granted
- "Building Stone (Sand stone) Mining Project" — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.