Quick answers
What is this project?
Riverbed Ordinary Sand Mine, (on the Riverbed of Ganga River) Village- Nadini (Gata/Araji No.-2/4, lease area- 5.0 ha.) Tehsil- Sadar, District– Mirzapur, State- Uttar Pradesh, Developed By Shri Sujit Kumar Singh is an approved mining project in Nandni, Mirzapur, Uttar Pradesh. The site covers 12.4 acres.
Who is building it?
The applicant is Sujit Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Sept 2023), as of 27 Nov 2026.
Where is it?
In Nandni, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹56 lakh and a site of 12.4 acres.
When was it filed?
The application was filed on 20 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Sept 2023 |
| Application filed | 20 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sujit Singh |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹56 lakh |
| Village / locality | Nandni |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01256 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Sept 2023 (this page) | Environmental approval granted | 12.4 acres | ₹56 lakh |
| Early planning filed 20 Mar 2023 | Cleared for impact study | 12.4 acres | ₹56 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.4 acres, this one is larger than 95% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 37.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Nandni, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Ordinary Sand Mine, (on the Riverbed of Ganga River) Village- Nadini… — cleared for impact study, 0 m away
- Proposed project of Ordinary Sand Mining project at Gata No.- 2/3, Area- 5.0… — cleared for impact study, 200 m away
- Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga… — environmental approval granted, 350 m away
- Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga… — cleared for impact study, 350 m away
- Proposed Forest Land to be diverted for Work of Tourism Infrastructure… — in-principle approval, conditions pending, 13 km away
- "Ordinary Sand Mining" at Ganga River Bed — environmental approval granted, 14.1 km away
- "Ordinary Sand Mining" at Ganga River Bed — cleared for impact study, 14.1 km away