Quick answers
What is this project?
Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga River at Arazi No. 2/5, Area 5.0 ha is a proposed mining project in Nandni, Mirzapur, Uttar Pradesh. The site covers 12.4 acres.
Who is building it?
The applicant is Rudra Mining and Company.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Aug 2023), as of 27 Nov 2026.
Where is it?
In Nandni, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 12.4 acres.
When was it filed?
The application was filed on 18 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga River at…
Project details
| Official title | Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga River at Arazi No. 2/5, Area 5.0 ha in Village- Nadini, Tehsil- Sadar, District- Mirzapur, Uttar Pradesh |
|---|---|
| Status | Cleared for impact study |
| Status since | 18 Aug 2023 |
| Application filed | 18 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rudra Mining and Company |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹1 crore |
| Village / locality | Nandni |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01077 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Apr 2024 | Environmental approval granted | 12.4 acres | ₹1 crore |
| Early planning filed 18 Aug 2023 (this page) | Cleared for impact study | 12.4 acres | ₹1 crore |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.4 acres, this one is larger than 95% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 24.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Nandni, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga… — environmental approval granted, 0 m away
- Riverbed Ordinary Sand Mine, (on the Riverbed of Ganga River) Village- Nadini… — environmental approval granted, 350 m away
- Riverbed Ordinary Sand Mine, (on the Riverbed of Ganga River) Village- Nadini… — cleared for impact study, 350 m away
- Proposed project of Ordinary Sand Mining project at Gata No.- 2/3, Area- 5.0… — cleared for impact study, 550 m away
- Proposed Forest Land to be diverted for Work of Tourism Infrastructure… — in-principle approval, conditions pending, 12.9 km away
- Proposed Forest Land to be diverted for Beautification Work of Temple — more information requested, 14.3 km away
- "Ordinary Sand Mining" at Ganga River Bed — environmental approval granted, 14.5 km away
- "Ordinary Sand Mining" at Ganga River Bed — cleared for impact study, 14.5 km away
All 4 Rudra Mining and Company projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.