What is Developing? Open the mapMap

Environmental approval grantedMining · Mirzapur, Uttar Pradesh

Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga River at Arazi No. 2/5, Area 5.0 ha

Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga River at Arazi No. 2/5, Area 5.0 ha is an approved mining project in Nandni, Mirzapur, Uttar Pradesh. The site covers 12.4 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 May 2025).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga River at Arazi No. 2/5, Area 5.0 ha is an approved mining project in Nandni, Mirzapur, Uttar Pradesh. The site covers 12.4 acres.

Who is building it?

The applicant is Rudra Mining and Company.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 8 May 2025), as of 27 Nov 2026.

Where is it?

In Nandni, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1 crore and a site of 12.4 acres.

When was it filed?

The application was filed on 5 Apr 2024.

Project details

Official titleProposed Project of riverbed "Ordinary Sand Mining" on the riverbed of Ganga River at Arazi No. 2/5, Area 5.0 ha in Village- Nadini, Tehsil- Sadar, District- Mirzapur, Uttar Pradesh
StatusEnvironmental approval granted
Status since8 May 2025
Application filed5 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRudra Mining and Company
Land area12.4 acres (5 ha)
Project cost₹1 crore
Village / localityNandni
Taluk / tehsilMirzapur
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01651

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 5 Apr 2024 (this page)Environmental approval granted12.4 acres₹1 crore
Early planning filed 18 Aug 2023Cleared for impact study12.4 acres₹1 crore

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.4 acres, this one is larger than 95% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 24.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Nandni, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Rudra Mining and Company projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.