Quick answers
What is this project?
"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project is an approved mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 3.8 acres.
Who is building it?
The applicant is Vineeta Sahu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Sept 2022), as of 27 Nov 2026.
Where is it?
In Pahra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹73 lakh and a site of 3.8 acres.
When was it filed?
The application was filed on 21 Sept 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Sept 2022 |
| Application filed | 21 Sept 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vineeta Sahu |
| Land area | 3.8 acres (1.5 ha) |
| Project cost | ₹73 lakh |
| Village / locality | Pahra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00168 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.8 acres, this one is larger than 63% of them.
No other mining lease on record is within 500 m of this site; 17 have applied within 5 km.
Where it is
Pahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 1 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 1 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 1.2 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 1.2 km away
- Building Stone (Granite), Khanda, Boulder, Ballast (Gitty) Mine Arazi No.… — environmental approval granted, 1.2 km away
- Building Stone (Granite), Khanda, Boulder, Ballast (Gitty) Mine Arazi No.… — cleared for impact study, 1.2 km away
- Project, of "Building Stone as Khanda, Boulders, Ballast (Gitti) Mining… — environmental approval granted, 1.5 km away
- Project, of "Building Stone as Khanda, Boulders, Ballast (Gitti) Mining… — cleared for impact study, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.