What is Developing? Open the mapMap

Cleared for impact studyMining · Mahoba, Uttar Pradesh

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 2647, Village- Pahra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 2.047 ha.) Ms R.R. Enterprises, Prop.- Smt. Rukaiya Khan W/o Shri Riyazuddin

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 2647, Village- Pahra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 2.047 ha.) Ms R.R. Enterprises, Prop.- Smt. Rukaiya Khan W/o Shri Riyazuddin is a proposed mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 5.1 acres. Its stated project cost is ₹72 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 May 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 2647, Village- Pahra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 2.047 ha.) Ms R.R. Enterprises, Prop.- Smt. Rukaiya Khan W/o Shri Riyazuddin is a proposed mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 5.1 acres.

Who is building it?

The applicant is Rukaiya Khan.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 May 2023), as of 27 Nov 2026.

Where is it?

In Pahra, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹72 lakh and a site of 5.1 acres.

When was it filed?

The application was filed on 17 May 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 2647,…

Project details

StatusCleared for impact study
Status since17 May 2023
Application filed17 May 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRukaiya Khan
Land area5.1 acres (2.1 ha)
Project cost₹72 lakh
Village / localityPahra
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01188

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Nov 2023Environmental approval granted5.1 acres₹72 lakh
Early planning filed 17 May 2023 (this page)Cleared for impact study5.1 acres₹72 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5.1 acres, this one is larger than 87% of them.

No other mining lease on record is within 500 m of this site; 18 have applied within 5 km.

Where it is

Pahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.