What is Developing? Open the mapMap

Environmental approval grantedMining · Mahoba, Uttar Pradesh

Building Stone (Granite), Khanda, Boulder, Ballast (Gitty) Mine Arazi No. 2441, 2442, Village– Pahra, Tehsil- Sadar, District–mahoba, (Uttar Pradesh) Applied Area 1.214 Ha Applied Lease Period – 10 Years Plan Period- 5 Years

Building Stone (Granite), Khanda, Boulder, Ballast (Gitty) Mine Arazi No. 2441, 2442, Village– Pahra, Tehsil- Sadar, District–mahoba, (Uttar Pradesh) Applied Area 1.214 Ha Applied Lease Period – 10 Years Plan Period- 5 Years is an approved mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 32.4 acres. Its stated project cost is ₹76 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Jun 2025).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Building Stone (Granite), Khanda, Boulder, Ballast (Gitty) Mine Arazi No. 2441, 2442, Village– Pahra, Tehsil- Sadar, District–mahoba, (Uttar Pradesh) Applied Area 1.214 Ha Applied Lease Period – 10 Years Plan Period- 5 Years is an approved mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 32.4 acres.

Who is building it?

The applicant is Sarita Yadav.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 10 Jun 2025), as of 27 Nov 2026.

Where is it?

In Pahra, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹76 lakh and a site of 32.4 acres.

When was it filed?

The application was filed on 4 Mar 2025.

Project details

StatusEnvironmental approval granted
Status since10 Jun 2025
Application filed4 Mar 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSarita Yadav
Land area32.4 acres (13.1 ha)
Project cost₹76 lakh
Village / localityPahra
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03277

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 Mar 2025 (this page)Environmental approval granted32.4 acres₹76 lakh
Early planning filed 3 Jul 2023Cleared for impact study32.4 acres₹76 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 32.4 acres, this one is larger than 99% of them.

No other mining lease on record is within 500 m of this site; 18 have applied within 5 km.

Where it is

Pahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sarita Yadav in Mahoba

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.