What is Developing? Open the mapMap

Cleared for impact studyMining · Mahoba, Uttar Pradesh

Building Stone (Granite), Khanda, Boulder, Ballast (Gitty) Mine Arazi No. 2441, 2442, Village– Pahra, Tehsil- Sadar, District–mahoba, (Uttar Pradesh) Applied Area 1.214 Ha Applied Lease Period – 10 Years Plan Period- 5 Years

Building Stone (Granite), Khanda, Boulder, Ballast (Gitty) Mine Arazi No. 2441, 2442, Village– Pahra, Tehsil- Sadar, District–mahoba, (Uttar Pradesh) Applied Area 1.214 Ha Applied Lease Period – 10 Years Plan Period- 5 Years is a proposed mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 32.4 acres. Its stated project cost is ₹76 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Jul 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Building Stone (Granite), Khanda, Boulder, Ballast (Gitty) Mine Arazi No. 2441, 2442, Village– Pahra, Tehsil- Sadar, District–mahoba, (Uttar Pradesh) Applied Area 1.214 Ha Applied Lease Period – 10 Years Plan Period- 5 Years is a proposed mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 32.4 acres.

Who is building it?

The applicant is Sarita Yadav.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 3 Jul 2023), as of 27 Nov 2026.

Where is it?

In Pahra, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹76 lakh and a site of 32.4 acres.

When was it filed?

The application was filed on 3 Jul 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Building Stone (Granite), Khanda, Boulder, Ballast (Gitty) Mine Arazi No. 2441, 2442,…

Project details

StatusCleared for impact study
Status since3 Jul 2023
Application filed3 Jul 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSarita Yadav
Land area32.4 acres (13.1 ha)
Project cost₹76 lakh
Village / localityPahra
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00798

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 Mar 2025Environmental approval granted32.4 acres₹76 lakh
Early planning filed 3 Jul 2023 (this page)Cleared for impact study32.4 acres₹76 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 32.4 acres, this one is larger than 99% of them.

No other mining lease on record is within 500 m of this site; 18 have applied within 5 km.

Where it is

Pahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Sarita Yadav in Mahoba

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.