Quick answers
What is Kukuhipur Building Stone (Sand Stone) Mining project?
Kukuhipur Building Stone (Sand Stone) Mining project is an approved mining project in Kukuhipur, Chunar, Mirzapur, Uttar Pradesh. The site covers 6 acres.
Who is building it?
The applicant is Shivdatt Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Oct 2022), as of 27 Nov 2026.
Where is it?
In Kukuhipur, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 6 acres.
When was it filed?
The application was filed on 28 Oct 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Oct 2022 |
| Application filed | 28 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shivdatt Singh |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Kukuhipur |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Taluk / tehsil |
| Our reference | WID-UP-00169 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 6 acres, this one is larger than 82% of them.
Where it is
Kukuhipur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chunar Fort (A Unit of Chunar Fort and Palace Pvt. Ltd.), CHUNAR, District… — environmental approval granted, 900 m away
- Environmental Clearance for Proposed River Bed Ordinary Sand Mining Having… — environmental approval granted, 2.5 km away
- ORDINARY SAND MINE (GANGA RIVER) — cleared for impact study, 2.9 km away
- Environment Clearance of proposed river bed ordinary sand mining having lease… — lapsed, 2.9 km away
- Environment Clearance of proposed river bed ordinary sand mining having lease… — lapsed, 3.1 km away
- Environmental Clearance of proposed production of 2,28,000 MTA Milled Steel… — environmental approval granted, 3.7 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — environmental approval granted, 3.7 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — cleared for impact study, 3.7 km away
More from Shivdatt Singh in Mirzapur
- "Building stone (Sandstone)" Mine at Arazi/Gata No.- 36/6/5, Lease area- 0.809… — environmental approval granted
- "Building stone (Sandstone)" Mine at Arazi/Gata No.- 36/6/5, Lease area- 0.809… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.