Quick answers
What is this project?
Regularization of existing unit having production of 2,37,600 MTA Milled Steel Products as Sariya, Gatar and Ingal through Rolling mill at Khasra No. 142, 143, 144/240, 144/241, 144me, 145, 168, 169 Village – Dumduma, Tehsil Chunar, District – Mirzapur, Pin – 231304, Uttar Pradesh by M/s Maa Mahamaya Alloys Private Limited (Unit-2) is a proposed industrial project in Dumduma, Chunar, Mirzapur, Uttar Pradesh. The site covers 11.2 acres.
Who is building it?
The applicant is Bhupendra Agrawal.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Mar 2023), as of 27 Nov 2026.
Where is it?
In Dumduma, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹40 crore and a site of 11.2 acres.
When was it filed?
The application was filed on 29 Mar 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Regularization of existing unit having production of 2,37,600 MTA Milled Steel Products…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Mar 2023 |
| Application filed | 29 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bhupendra Agrawal |
| Land area | 11.2 acres (4.6 ha) |
| Project cost | ₹40 crore |
| Village / locality | Dumduma |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00871 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 May 2023 | Environmental approval granted | 11.2 acres | ₹40 crore |
| Early planning filed 29 Mar 2023 (this page) | Cleared for impact study | 11.2 acres | ₹40 crore |
In context
16 applications in Mirzapur since January 2022 are in the same category (Industry): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 11.2 acres, this one is smaller than 69% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dumduma, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — environmental approval granted, 0 m away
- Environmental Clearance of proposed production of 2,28,000 MTA Milled Steel… — environmental approval granted, 150 m away
- Expansion of existing unit from 70mt/day to 280mt/day having production of… — environmental approval granted, 250 m away
- Proposed Expansion of Cement Production Clinker Grinding Unit Capacity From… — initial checks, 2.6 km away
- Transfer of Environmental Clearance for "Cement Grinding Unit" at Araji… — environmental approval granted, 3.2 km away
- Proposed Sardar Patel Apex University, situated at NH-35, Mirzapur–Varanasi… — under environmental review, 3.3 km away
- Chunar Fort (A Unit of Chunar Fort and Palace Pvt. Ltd.), CHUNAR, District… — environmental approval granted, 3.4 km away
- Kukuhipur Building Stone (Sand Stone) Mining project — environmental approval granted, 3.7 km away
More from Bhupendra Agrawal in Mirzapur
- Terms of Reference Application for Expansion of Existing Unit From 96mt/Day to… — environmental approval granted
- Terms of Reference Application for Expansion of Existing Unit From 96mt/Day to… — cleared for impact study
- Environmental Clearance of proposed production of 2,28,000 MTA Milled Steel… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.