Quick answers
What is ORDINARY SAND MINE (GANGA RIVER)?
ORDINARY SAND MINE (GANGA RIVER) is a proposed mining project in Basharatpur, Chunar, Mirzapur, Uttar Pradesh. The site covers 12.4 acres.
Who is building it?
The applicant is Anil Shukla.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Sept 2023), as of 27 Nov 2026.
Where is it?
In Basharatpur, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 12.4 acres.
When was it filed?
The application was filed on 16 Sept 2023.
Project details
| Official title | ORDINARY SAND MINE (GANGA RIVER) at ARAJI No.: 140/2 Village Basaratpur, Tehsil Chunar & District Mirzapur, (U.P.) Total Lease Area – 5.0 Ha. |
|---|---|
| Status | Cleared for impact study |
| Status since | 16 Sept 2023 |
| Application filed | 16 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Anil Shukla |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Basharatpur |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01069 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 12.4 acres, this one is larger than 95% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 44.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Basharatpur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance of proposed river bed ordinary sand mining having lease… — lapsed, 0 m away
- Environment Clearance of proposed river bed ordinary sand mining having lease… — lapsed, 250 m away
- Environmental Clearance for Proposed River Bed Ordinary Sand Mining Having… — environmental approval granted, 400 m away
- Kukuhipur Building Stone (Sand Stone) Mining project — environmental approval granted, 2.9 km away
- Chunar Fort (A Unit of Chunar Fort and Palace Pvt. Ltd.), CHUNAR, District… — environmental approval granted, 3.4 km away
- Environmental Clearance of proposed production of 2,28,000 MTA Milled Steel… — environmental approval granted, 6.6 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — environmental approval granted, 6.6 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — cleared for impact study, 6.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.