Quick answers
What is this project?
Environmental Clearance for Proposed River Bed Ordinary Sand Mining Having Lease Area- 9.0 Ha Along River Ganga in Gata No-140/3 & 4 is an approved mining project in Basharatpur, Chunar, Mirzapur, Uttar Pradesh. The site covers 22.2 acres.
Who is building it?
The applicant is Madhuri Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Feb 2023), as of 27 Nov 2026.
Where is it?
In Basharatpur, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 22.2 acres.
When was it filed?
The application was filed on 1 Feb 2023.
Project details
| Official title | Environmental Clearance for Proposed River Bed Ordinary Sand Mining Having Lease Area- 9.0 Ha Along River Ganga in Gata No-140/3 & 4 at Village-Basaratpur, Tehsil- Chunar, District- Mirzapur, U. P. of M/S Vidhata Associate. |
|---|---|
| Status | Environmental approval granted |
| Status since | 1 Feb 2023 |
| Application filed | 1 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Madhuri Singh |
| Land area | 22.2 acres (9 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Basharatpur |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00658 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 22.2 acres, this one is larger than 99% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 46.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Basharatpur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- ORDINARY SAND MINE (GANGA RIVER) — cleared for impact study, 400 m away
- Environment Clearance of proposed river bed ordinary sand mining having lease… — lapsed, 400 m away
- Environment Clearance of proposed river bed ordinary sand mining having lease… — lapsed, 600 m away
- Kukuhipur Building Stone (Sand Stone) Mining project — environmental approval granted, 2.5 km away
- Chunar Fort (A Unit of Chunar Fort and Palace Pvt. Ltd.), CHUNAR, District… — environmental approval granted, 3.1 km away
- Environmental Clearance of proposed production of 2,28,000 MTA Milled Steel… — environmental approval granted, 6.2 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — environmental approval granted, 6.3 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — cleared for impact study, 6.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.