What is Developing? Open the mapMap

Environmental approval grantedMining · Mahoba, Uttar Pradesh

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 19 (Khand No.- 2 Old), Village- Ganj, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.048 ha.)

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 19 (Khand No.- 2 Old), Village- Ganj, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.048 ha.) is an approved mining project in Ganj, Mahoba, Uttar Pradesh. The site covers 10 acres. Its stated project cost is ₹88 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 16 Aug 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 19 (Khand No.- 2 Old), Village- Ganj, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.048 ha.) is an approved mining project in Ganj, Mahoba, Uttar Pradesh. The site covers 10 acres.

Who is building it?

The applicant is P N C Mining Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 16 Aug 2023), as of 27 Nov 2026.

Where is it?

In Ganj, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹88 lakh and a site of 10 acres.

When was it filed?

The application was filed on 16 Aug 2023.

Project details

StatusEnvironmental approval granted
Status since16 Aug 2023
Application filed16 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantP N C Mining Private Limited
Land area10 acres (4.1 ha)
Project cost₹88 lakh
Village / localityGanj
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromVillage
Our referenceWID-UP-00281

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 23 Nov 2023Cleared for impact study10 acres₹88 lakh
New project filed 16 Aug 2023 (this page)Environmental approval granted10 acres₹88 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10 acres, this one is larger than 96% of them.

Where it is

Ganj, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from P N C Mining Private Limited in Mahoba

4 P N C Mining projects in Mahoba
All 6 P N C Mining projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.