Quick answers
What is this project?
Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Araji No.- 224, Village- Paharetha, Tehsil- Charkhari, District- Mahoba, U.P. (Applied Area : 0.558 ha.) is an approved mining project in Pahretha, Charkhari, Mahoba, Uttar Pradesh. The site covers 1.4 acres.
Who is building it?
The applicant is Upendra Shukla.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Nov 2023), as of 27 Nov 2026.
Where is it?
In Pahretha, Charkhari, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹66 lakh and a site of 1.4 acres.
When was it filed?
The application was filed on 16 Nov 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Upendra Shukla |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹66 lakh |
| Village / locality | Pahretha |
| Taluk / tehsil | Charkhari |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00426 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 92% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Pahretha, Charkhari, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building stone (Khanda, Gitti, Boulders)" Project at Gata No.-482, Village-… — environmental approval granted, 12.8 km away
- "Granite and Dolostone Ballast Gitti Mining Project" at Gata No./Khand: 979… — under environmental review, 14.1 km away
- Proposed Project of "Building Stone Khanda, Boulders, (Gitti) Mining Project"… — cleared for impact study, 14.1 km away
- "Granite and Dolostone Ballast Gitti Mining Project" at Gata No./Khand: 979… — cleared for impact study, 14.2 km away
- Proposed Project of "Building Stone Khanda, Boulders, (Gitti) Mining Project"… — cleared for impact study, 14.2 km away
- Transfer of Environmental Clearance of proposed project of Granite & Dolostone… — environmental approval granted, 14.2 km away
- "Granite & Dolostone, Ballast (Gitty) Mining Project" — environmental approval granted, 15.5 km away
- "Granite and Dolostone, Ballast, Gitti Mine" from Village- Utiyan, Gata/Arazi… — cleared for impact study, 16 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.