Quick answers
What is this project?
"Sand/ Morrum Mining" Project at Gata No.- 58, 107, 108, 109, 110, 111, & 114, Village- Madauli Khurd Khadar, Tehsil- Pailani, District- Banda, U.P. (Applied Area : 7.053 ha.) Pragyavision Business (O.P.C) Pvt. Ltd. Director- Shri Yaduvanshi Vikas Singh S/o Shri Yaduvanshi Ashok Kumar Singh is a proposed mining project in Marauli Khurd, Banda, Uttar Pradesh. The site covers 17.4 acres.
Who is building it?
The applicant is Yaduvanshi Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Nov 2023), as of 27 Nov 2026.
Where is it?
In Marauli Khurd, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh and a site of 17.4 acres.
When was it filed?
The application was filed on 6 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/ Morrum Mining" Project at Gata No.- 58, 107, 108, 109, 110, 111, & 114, Village-…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Nov 2023 |
| Application filed | 6 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Yaduvanshi Singh |
| Land area | 17.4 acres (7.1 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Marauli Khurd |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00379 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Mar 2024 | Environmental approval granted | 17.4 acres | ₹65 lakh |
| Early planning filed 6 Nov 2023 (this page) | Cleared for impact study | 17.4 acres | ₹65 lakh |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 17.4 acres, this one is smaller than 77% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Marauli Khurd, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/ Morrum Mining" Project at Gata No.- 58, 107, 108, 109, 110, 111, & 114,… — environmental approval granted, 0 m away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Delving… — environmental approval granted, 1.8 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Delving… — cleared for impact study, 1.8 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — more information requested, 1.9 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — environmental approval granted, 2.4 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Ken River… — cleared for impact study, 2.4 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s J P O… — environmental approval granted, 2.9 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s J P O… — cleared for impact study, 2.9 km away