Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Ken River of M/s J P O Polychem Pvt. Ltd. Director- Shri Parash Jain S/o Shri Hanuman Mal Jain, located at Gata No. 122/7 & 111/2 (Khand No. 02), Village – Barehata Khadar, Tehsil - Pailani, District - Banda, Uttar-Pradesh. Sanctioned Lease Area- 13.00 ha is a proposed mining project in Amara, Banda, Uttar Pradesh. The site covers 32.1 acres.
Who is building it?
The applicant is J P O Polychem PRIVATE LIMITED.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 Apr 2025), as of 27 Nov 2026.
Where is it?
In Amara, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 32.1 acres.
When was it filed?
The application was filed on 14 Dec 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Ken River of M/s J P O Polychem Pvt.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Apr 2025 |
| Application filed | 14 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | J P O Polychem PRIVATE LIMITED |
| Land area | 32.1 acres (13 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Amara |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01709 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Oct 2025 | Environmental approval granted | 32.1 acres | ₹1.7 crore |
| Early planning filed 14 Dec 2024 (this page) | Cleared for impact study | 32.1 acres | ₹1.7 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 32.1 acres, this one is smaller than 53% of them.
No other mining lease on record is within 500 m of this site; 19 have applied within 5 km.
Where it is
Amara, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed sand/morrum mining project from Ken River of M/s J P O… — environmental approval granted, 0 m away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Gypsy shack… — more information requested, 1.3 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Gypsy shack… — cleared for impact study, 1.3 km away
- "Sand/Morrum Mining" from Riverbed of ken River — under environmental review, 1.8 km away
- "Sand/ Morrum Mining" Project at Gata No.- 58, 107, 108, 109, 110, 111, & 114,… — environmental approval granted, 2.9 km away
- "Sand/ Morrum Mining" Project at Gata No.- 58, 107, 108, 109, 110, 111, & 114,… — cleared for impact study, 2.9 km away
- Proposed Project of riverbed "Sand/ Morrum Mining Project" on the riverbed of… — under environmental review, 3.1 km away
- Sadi Khadar Sand/Morrum Mining Project, Located on river bed of Ken River… — under environmental review, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.