Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Nov 2023 |
| Application filed | 18 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Arvind Kumar |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Nasratpur |
| Taluk / tehsil | Shahjahanpur |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00385 |
In context
31 applications in Shahjahanpur since January 2022 are in the same category (Mining): 23 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.7 acres, this one is smaller than 81% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Nasratpur, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of 12" Carbon steel Gas Pipeline along the road by BPCL on… — lapsed, 700 m away
- Laying of 12" Carbon Steel Gas Pipeline Along the Road by Bpcl on SH-29… — forest land use approved, 850 m away
- Proposed Cane Juice Syrup/B Or C Heavy Molasses/ Grain Based Distillery Having… — environmental approval granted, 3.1 km away
- Proposed Cane Juice Syrup/B Or C Heavy Molasses/ Grain Based Distillery Having… — cleared for impact study, 3.1 km away
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — environmental approval granted, 3.2 km away
- Expansion of existing Sugar unit from 4500 TCD to 6500 TCD and expansion in co… — cleared for impact study, 3.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Nayara Energy… — lapsed, 4 km away
- Proposed IOCL Retail Outlet — forest land use approved, 5.9 km away
More from Arvind Kumar in Shahjahanpur
- Dadiura Soil Mining Project — environmental approval granted
- Dadiura Soil Mining Project — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.