Cleared for impact studyMining · Hamirpur, Uttar Pradesh

"Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya, (Khand No. 22/12, Area-12.145 Ha.) Tehsil- Sarila, District– Hamirpur, Uttar Pradesh Developed by Shri Pramod Kumar Singh

"Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya, (Khand No. 22/12, Area-12.145 Ha.) Tehsil- Sarila, District– Hamirpur, Uttar Pradesh Developed by Shri Pramod Kumar Singh is a proposed mining project in Chandaut, Sarila, Hamirpur, Uttar Pradesh. The site covers 30 acres. Its stated project cost is ₹2.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 10 May 2023).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya, (Khand No. 22/12, Area-12.145 Ha.) Tehsil- Sarila, District– Hamirpur, Uttar Pradesh Developed by Shri Pramod Kumar Singh is a proposed mining project in Chandaut, Sarila, Hamirpur, Uttar Pradesh. The site covers 30 acres.

Who is building it?

The applicant is Pramod Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 10 May 2023), as of 27 Nov 2026.

Where is it?

In Chandaut, Sarila, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹2.1 crore and a site of 30 acres.

When was it filed?

The application was filed on 10 May 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya, (Khand No.…

Project details

StatusCleared for impact study
Status since10 May 2023
Application filed10 May 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantPramod Singh
Land area30 acres (12.2 ha)
Project cost₹2.1 crore
Village / localityChandaut
Taluk / tehsilSarila
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00668

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 Jan 2024Environmental approval granted30 acres₹2.1 crore
Early planning filed 10 May 2023 (this page)Cleared for impact study30 acres₹2.1 crore

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is smaller than 87% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 204.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.

Where it is

Chandaut, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pramod Singh in Hamirpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.