Quick answers
What is this project?
Expansion of existing unit from 70mt/day to 280mt/day having production of 89,600 MTA Billets through Electrical/ Induction Furnace at Khasra No. 140, 141, 144/240, 144/241, 144me, 189 Village – Dumduma, Tehsil Chunar, District – Mirzapur, Pin – 231304, Uttar Pradesh by M/s Maa Mahamaya Alloys Private Limited is an approved industrial project in Dumduma, Chunar, Mirzapur, Uttar Pradesh. The site covers 6 acres.
Who is building it?
The applicant is Maa Mahamaya Alloys Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Sept 2023), as of 27 Nov 2026.
Where is it?
In Dumduma, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹12 crore and a site of 6 acres.
When was it filed?
The application was filed on 6 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Sept 2023 |
| Application filed | 6 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Maa Mahamaya Alloys Private Limited |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹12 crore |
| Village / locality | Dumduma |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-00894 |
In context
16 applications in Mirzapur since January 2022 are in the same category (Industry): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 6 acres, this one is smaller than 81% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dumduma, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance of proposed production of 2,28,000 MTA Milled Steel… — environmental approval granted, 200 m away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — environmental approval granted, 250 m away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — cleared for impact study, 250 m away
- Proposed Expansion of Cement Production Clinker Grinding Unit Capacity From… — initial checks, 2.6 km away
- Transfer of Environmental Clearance for "Cement Grinding Unit" at Araji… — environmental approval granted, 3.1 km away
- Chunar Fort (A Unit of Chunar Fort and Palace Pvt. Ltd.), CHUNAR, District… — environmental approval granted, 3.6 km away
- Proposed Sardar Patel Apex University, situated at NH-35, Mirzapur–Varanasi… — under environmental review, 3.6 km away
- Proposed Expansion of Existing Unit From 96 TPD To 700 TPD MS Billets Through… — more information requested, 3.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.