Quick answers
What is this project?
Proposed Sardar Patel Apex University, situated at NH-35, Mirzapur–Varanasi Road, Mauja Samaspur, Pargana Haveli, Tehsil - Chunar, District - Mirzapur, Uttar Pradesh by Apex Welcare Trust is a proposed building project in Samaspur, Chunar, Mirzapur, Uttar Pradesh. The site covers 50.5 acres.
Who is building it?
The applicant is Apex Welcare Trust.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Samaspur, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹214.6 crore and a site of 50.5 acres.
When was it filed?
The application was filed on 6 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 6 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Apex Welcare Trust |
| Land area | 50.5 acres (20.4 ha) |
| Project cost | ₹214.6 crore |
| Village / locality | Samaspur |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04049 |
In context
6 applications in Mirzapur since January 2022 are in the same category (Buildings & townships): 1 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
48 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Samaspur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Cement Production Clinker Grinding Unit Capacity From… — initial checks, 3 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — environmental approval granted, 3.3 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — cleared for impact study, 3.3 km away
- Environmental Clearance of proposed production of 2,28,000 MTA Milled Steel… — environmental approval granted, 3.5 km away
- Expansion of existing unit from 70mt/day to 280mt/day having production of… — environmental approval granted, 3.6 km away
- Chunar Fort (A Unit of Chunar Fort and Palace Pvt. Ltd.), CHUNAR, District… — environmental approval granted, 3.7 km away
- Area- 5.5700 Ha Building Stone (Sandstone) Gitti-Boulder Mining Project at… — under environmental review, 3.7 km away
- Building Stone, Sandstone, Quartzite, Ballast & Gitti Mining project of Gata… — under environmental review, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.