Quick answers
What is this project?
Proposed Expansion of Cement Production Clinker Grinding Unit Capacity From 360000 Tpa to 504000 Tpa Without Increase in Pollution Load is a proposed industrial project in Baragaon, Chunar, Mirzapur, Uttar Pradesh. The site covers 20 acres.
Who is building it?
The applicant is Rlj Cement Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Baragaon, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹17 crore and a site of 20 acres.
When was it filed?
The application was filed on 28 Dec 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 28 Dec 2024 |
| Application filed | 28 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Rlj Cement Limited |
| Land area | 20 acres (8.1 ha) |
| Project cost | ₹17 crore |
| Village / locality | Baragaon |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01977 |
In context
16 applications in Mirzapur since January 2022 are in the same category (Industry): 9 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 20 acres, this one is smaller than 56% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baragaon, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance for "Cement Grinding Unit" at Araji… — environmental approval granted, 2 km away
- Proposed Expansion of Existing Unit From 96 TPD To 700 TPD MS Billets Through… — more information requested, 2.2 km away
- Terms of Reference Application for Expansion of Existing Unit From 96mt/Day to… — environmental approval granted, 2.2 km away
- Terms of Reference Application for Expansion of Existing Unit From 96mt/Day to… — cleared for impact study, 2.2 km away
- Laying of Underground Optical Fibre Cable — lapsed, 2.4 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — environmental approval granted, 2.6 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — cleared for impact study, 2.6 km away
- Expansion of existing unit from 70mt/day to 280mt/day having production of… — environmental approval granted, 2.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.