Quick answers
What is this project?
Proposed Protected Forest Land to Be Diverted for Entry & Exit Approach to Bpcl Retail Outlet on Bareilly - Lucknow Road, NH-30 (Old NH-24) in Km 265, Chainage 264+850 to 264+885, Lhs at Khasra No. 54 Min. , Village Megee Nagla, Tehsil Faridpur, District Bareilly is an approved fuel station in Megi Nagla, Faridpur, Bareilly, Uttar Pradesh. The site covers 0.9 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 27 Jan 2026), as of 27 Nov 2026.
Where is it?
In Megi Nagla, Faridpur, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.9 acres and 2,130 m² of forest land.
When was it filed?
The application was filed on 28 Jul 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 27 Jan 2026 |
| Application filed | 28 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,700 m² |
| Forest land | 2,130 m² |
| Project cost | ₹50 lakh |
| Village / locality | Megi Nagla |
| Taluk / tehsil | Faridpur |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06600 |
In context
25 applications in Bareilly since January 2022 are in the same category (Fuel stations): 17 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.9 acres, this one is larger than 70% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Megi Nagla, Faridpur, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 250 m away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 1.8 km away
- "Integrated Municipal Solid Waste Management Facility" with capacity of 500TPD — more information requested, 2 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 4.7 km away
- Amended BharatNet Program (ABP) — initial checks, 6.6 km away
- Amended Bharatnet Project (Faridpur-Bareilly) — lapsed, 7.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 8.5 km away
- "Ordinary Earth Excavation/Mining Project" at Gata No.-300, 302 — environmental approval granted, 8.8 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Bareilly
- Proposed Forest Land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to Bharat… — lapsed
- Protected Forest Land Land Proposed To be diverted for Entry/Exit Approach… — forest land use approved
- Protected Forest Land Proposed to be diverted for Entry/Exit Approach Road to… — forest land use approved
9 Bharat Petroleum Corporation (BPCL) projects in Bareilly
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.