Quick answers
What is this project?
Proposed Protected Forest Land to be diverted for Laying of Underground Electrical Cable at Bareilly-Shahjahanpur Road (Old NH-24), Bareilly-Budaun Road (SH-33), Bareilly-Nainital Road (SH-37), Bareilly-Pilibhit Road (SH-33) at Distt-Bareilly, Uttar Pradesh is a lapsed power project in Amdhanpur, Bareilly, Uttar Pradesh. The site covers 2.4 acres.
Who is building it?
The applicant is Madhyanchal Vidhut Vitran Nigam LTD.
Has it been approved?
No. The application was lapsed on 11 Apr 2026, so it is no longer under consideration.
Where is it?
In Amdhanpur, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹38.9 crore; a site of 2.4 acres and 1.9 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 17 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Apr 2026 |
| Application filed | 17 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Madhyanchal Vidhut Vitran Nigam LTD |
| Land area | 2.4 acres (1 ha) |
| Forest land | 1.9 acres (0.8 ha) |
| Project cost | ₹38.9 crore |
| Village / locality | Amdhanpur |
| Taluk / tehsil | Bareilly |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06316 |
In context
9 applications in Bareilly since January 2022 are in the same category (Power): 1 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amdhanpur, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Integrated Municipal Solid Waste Management Facility" with capacity of 500TPD — more information requested, 2.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 3.8 km away
- Forest Land Proposed to be diverted for approach access to HPCL Retail Outlet… — forest land use approved, 4.4 km away
- Proposed Protected Forest Land to Be Diverted for Entry & Exit Approach to… — forest land use approved, 4.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 4.9 km away
- Amended BharatNet Program (ABP) — initial checks, 5.6 km away
- "Ordinary Earth Excavation/Mining Project" at Gata No.-300, 302 — environmental approval granted, 5.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 6.4 km away
More from Madhyanchal Vidhut Vitran Nigam LTD in Bareilly
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed
All 7 Madhyanchal Vidhut Vitran Nigam projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.