What is Developing? Open the mapMap

Cleared for impact studyMining · Banda, Uttar Pradesh

SAND/MORRUM MINE ON RIVER BED OF KEN RIVER AT PART OF GATA 5 & PART OF 9 VILLAGE – BILHARKA, TEHSIL – NARAINI & DISTRICT – BANDA (U.P.) TOTAL LEASE AREA – 12.86 HA. (31.77 Acre)

SAND/MORRUM MINE ON RIVER BED OF KEN RIVER AT PART OF GATA 5 & PART OF 9 VILLAGE – BILHARKA, TEHSIL – NARAINI & DISTRICT – BANDA (U.P.) TOTAL LEASE AREA – 12.86 HA. (31.77 Acre) is a proposed mining project in Bilharka, Naraini, Banda, Uttar Pradesh. The site covers 31.8 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 18 Sept 2023).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

SAND/MORRUM MINE ON RIVER BED OF KEN RIVER AT PART OF GATA 5 & PART OF 9 VILLAGE – BILHARKA, TEHSIL – NARAINI & DISTRICT – BANDA (U.P.) TOTAL LEASE AREA – 12.86 HA. (31.77 Acre) is a proposed mining project in Bilharka, Naraini, Banda, Uttar Pradesh. The site covers 31.8 acres.

Who is building it?

The applicant is Ashu Bhati.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 18 Sept 2023), as of 27 Nov 2026.

Where is it?

In Bilharka, Naraini, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.2 crore and a site of 31.8 acres.

When was it filed?

The application was filed on 18 Sept 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: SAND/MORRUM MINE ON RIVER BED OF KEN RIVER AT PART OF GATA 5 & PART OF 9 VILLAGE –…

Project details

StatusCleared for impact study
Status since18 Sept 2023
Application filed18 Sept 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAshu Bhati
Land area31.8 acres (12.9 ha)
Project cost₹1.2 crore
Village / localityBilharka
Taluk / tehsilNaraini
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01063

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 May 2024Environmental approval granted31.8 acres₹1.2 crore
Early planning filed 18 Sept 2023 (this page)Cleared for impact study31.8 acres₹1.2 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 31.8 acres, this one is smaller than 55% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Bilharka, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ashu Bhati in Banda

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.