Quick answers
What is this project?
SAND/MORRUM MINE ON RIVER BED OF KEN RIVER AT PART OF GATA 5 & PART OF 9 VILLAGE – BILHARKA, TEHSIL – NARAINI & DISTRICT – BANDA (U.P.) TOTAL LEASE AREA – 12.86 HA. (31.77 Acre) is an approved mining project in Bilharka, Naraini, Banda, Uttar Pradesh. The site covers 31.8 acres.
Who is building it?
The applicant is Ashu Bhati.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Nov 2024), as of 27 Nov 2026.
Where is it?
In Bilharka, Naraini, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 31.8 acres.
When was it filed?
The application was filed on 4 May 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Nov 2024 |
| Application filed | 4 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashu Bhati |
| Land area | 31.8 acres (12.9 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Bilharka |
| Taluk / tehsil | Naraini |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01389 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 May 2024 (this page) | Environmental approval granted | 31.8 acres | ₹1.2 crore |
| Early planning filed 18 Sept 2023 | Cleared for impact study | 31.8 acres | ₹1.2 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 31.8 acres, this one is smaller than 55% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bilharka, Naraini, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" at Gata No. Part of 5, Part of 9, Village– Bilharka,… — under environmental review, 0 m away
- "Sand/Morrum Mining" at Gata No. Part of 5, Part of 9, Village– Bilharka,… — under environmental review, 0 m away
- SAND/MORRUM MINE ON RIVER BED OF KEN RIVER AT PART OF GATA 5 & PART OF 9… — cleared for impact study, 0 m away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to BPCL… — forest land use approved, 7.6 km away
- Building stone (Gitti/Patthar & Pahari Morrum) mine at Gata No.-587 (Khand… — under environmental review, 9 km away
- Gitty/Stone Mine at Gata No. 587, Khand No. 04, Area- 2.00 Ha, Village-… — environmental approval granted, 9.1 km away
- Gitty/Stone Mine at Gata No. 587, Khand No. 04, Area- 2.00 Ha, Village-… — cleared for impact study, 9.1 km away
More from Ashu Bhati in Banda
- SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03,… — environmental approval granted
- SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.