Quick answers
What is RBM (Mixed Form) Mining Project at (Khoh River)?
RBM (Mixed Form) Mining Project at (Khoh River) is an approved mining project in Noorullapur, Nagina, Bijnor, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Chandra Jaiswal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Nov 2023), as of 27 Nov 2026.
Where is it?
In Noorullapur, Nagina, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 16 Nov 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chandra Jaiswal |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Noorullapur |
| Taluk / tehsil | Nagina |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01070 |
In context
24 applications in Bijnor since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Noorullapur, Nagina, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "RBM Mine (Mixed Form)" located at Gata No. 70 Mi, Total… — initial checks, 700 m away
- "RBM (MIXED FORM) Mining Project" at Gata No. – 70Mi, (Total area 1.265 Ha.) — environmental approval granted, 700 m away
- Shahalipur Gudad RBM Mining Project — environmental approval granted, 1.1 km away
- "RBM (Mixed Form)" at Gata No. 2/102, Area- 1.215 Ha, Village- Shah Alipur… — environmental approval granted, 1.2 km away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — environmental approval granted, 1.4 km away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — cleared for impact study, 1.4 km away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — environmental approval granted, 1.8 km away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — cleared for impact study, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.