Quick answers
What is Shahalipur Gudad RBM Mining Project?
Shahalipur Gudad RBM Mining Project is an approved mining project in Shah Alipur Gudar, Nagina, Bijnor, Uttar Pradesh. The site covers 3.7 acres.
Who is building it?
The applicant is Maya Devi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Nov 2024), as of 27 Nov 2026.
Where is it?
In Shah Alipur Gudar, Nagina, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 3.7 acres.
When was it filed?
The application was filed on 19 Mar 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Nov 2024 |
| Application filed | 19 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Maya Devi |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Shah Alipur Gudar |
| Taluk / tehsil | Nagina |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01927 |
In context
24 applications in Bijnor since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.7 acres, this one is smaller than 58% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 6.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Shah Alipur Gudar, Nagina, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "RBM (Mixed Form)" at Gata No. 2/102, Area- 1.215 Ha, Village- Shah Alipur… — environmental approval granted, 150 m away
- RBM (Mixed Form) Mining Project at (Khoh River) — environmental approval granted, 1.1 km away
- RBM (Mixed Form) Mining Project — environmental approval granted, 1.2 km away
- Proposed Project of "RBM Mine (Mixed Form)" located at Gata No. 70 Mi, Total… — initial checks, 1.6 km away
- "RBM (MIXED FORM) Mining Project" at Gata No. – 70Mi, (Total area 1.265 Ha.) — environmental approval granted, 1.6 km away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — environmental approval granted, 2.2 km away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — cleared for impact study, 2.2 km away
- River bed Material Deposit of River bed of Khoh River at Khand no. 121, 122 &… — environmental approval granted, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.