Quick answers
What is this project?
Proposed Project of "RBM Mine (Mixed Form)" located at Gata No. 70 Mi, Total area- 1.265 Ha., (Mining Plan Period- 6 Months), Village –Abdulfazalpur Pahara, Tehsil- Nagina, District- Bijnor (U.P.), M/s Pratap Construction Partner. - Shri Rana Pratap Singh is a proposed mining project in Abulfazal Pahari, Nagina, Bijnor, Uttar Pradesh. The site covers 3.1 acres.
Who is building it?
The applicant is Rana Pratap Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Abulfazal Pahari, Nagina, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 3.1 acres.
When was it filed?
The application was filed on 26 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 26 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rana Pratap Singh |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Abulfazal Pahari |
| Taluk / tehsil | Nagina |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07425 |
In context
24 applications in Bijnor since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.1 acres, this one is smaller than 71% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Abulfazal Pahari, Nagina, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "RBM (MIXED FORM) Mining Project" at Gata No. – 70Mi, (Total area 1.265 Ha.) — environmental approval granted, 0 m away
- RBM (Mixed Form) Mining Project at (Khoh River) — environmental approval granted, 700 m away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — environmental approval granted, 700 m away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — cleared for impact study, 700 m away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — environmental approval granted, 1.1 km away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — cleared for impact study, 1.1 km away
- Shahalipur Gudad RBM Mining Project — environmental approval granted, 1.6 km away
- "RBM (Mixed Form)" at Gata No. 2/102, Area- 1.215 Ha, Village- Shah Alipur… — environmental approval granted, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.