"RBM (MIXED FORM) Mining Project" at Gata No. – 70Mi, (Total area 1.265 Ha.) is an approved mining project in Abulfazal Pahari, Nagina, Bijnor, Uttar Pradesh. The site covers 3.1 acres.
Who is building it?
The applicant is Satish Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Dec 2024), as of 27 Nov 2026.
Where is it?
In Abulfazal Pahari, Nagina, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 3.1 acres.
When was it filed?
The application was filed on 9 Oct 2024.
Project details
| Official title | "RBM (MIXED FORM) Mining Project" at Gata No. – 70Mi, (Total area 1.265 Ha.) located in village Abdulfazalpur Pahara, Tehsil-Nagina District- Bijnor, Uttar Pradesh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 22 Dec 2024 |
| Application filed | 9 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Satish Kumar |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Abulfazal Pahari |
| Taluk / tehsil | Nagina |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01843 |
In context
24 applications in Bijnor since January 2022 are in the same category (Mining): 15 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.1 acres, this one is smaller than 71% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Abulfazal Pahari, Nagina, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "RBM Mine (Mixed Form)" located at Gata No. 70 Mi, Total… — initial checks, 0 m away
- RBM (Mixed Form) Mining Project at (Khoh River) — environmental approval granted, 700 m away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — environmental approval granted, 700 m away
- "R.B.M. [Sand, Bajri, Boulder (In Mix Form)] Mining" Project at Gata No.- 400… — cleared for impact study, 700 m away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — environmental approval granted, 1.1 km away
- Proposed Project of "Sand- Bajri-Boulders in Mixed State (RBM) Mine" located… — cleared for impact study, 1.1 km away
- Shahalipur Gudad RBM Mining Project — environmental approval granted, 1.6 km away
- "RBM (Mixed Form)" at Gata No. 2/102, Area- 1.215 Ha, Village- Shah Alipur… — environmental approval granted, 1.6 km away