Quick answers
What is this project?
"Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 142, Village- Pachehara, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.048 ha.) is a proposed mining project in Pachahra, Mahoba, Uttar Pradesh. The site covers 10 acres.
Who is building it?
The applicant is Shivam Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Jan 2023), as of 27 Nov 2026.
Where is it?
In Pachahra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹87 lakh and a site of 10 acres.
When was it filed?
The application was filed on 24 Jan 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 142, Village-…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Jan 2023 |
| Application filed | 24 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shivam Singh |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹87 lakh |
| Village / locality | Pachahra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01149 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Aug 2023 | Environmental approval granted | 10 acres | ₹87 lakh |
| Early planning filed 24 Jan 2023 (this page) | Cleared for impact study | 10 acres | ₹87 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10 acres, this one is larger than 96% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 21.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Pachahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 142,… — environmental approval granted, 0 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 300 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 300 m away
- "Building Stone Khanda,Boulder, Bailast (Gitti)" Project at Gata No.-841Mi… — environmental approval granted, 3.4 km away
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.-841 Mi… — environmental approval granted, 3.5 km away
- Building Stone or Khanda, Boulder, Ballast (Gitty) and Red Morrum mining project — environmental approval granted, 3.6 km away
- Paswara Buiding Stone or Granite Khanda, Boulder, Baillast (Gitti) Mining… — environmental approval granted, 3.6 km away
- Paswara Buiding Stone or Granite Khanda, Boulder, Baillast (Gitti) Mining… — cleared for impact study, 3.6 km away
More from Shivam Singh in Mahoba
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.