What is Developing? Open the mapMap

Environmental approval grantedMining · Mahoba, Uttar Pradesh

"Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 142, Village- Pachehara, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.048 ha.)

"Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 142, Village- Pachehara, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.048 ha.) is an approved mining project in Pachahra, Mahoba, Uttar Pradesh. The site covers 10 acres. Its stated project cost is ₹87 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Aug 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 142, Village- Pachehara, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.048 ha.) is an approved mining project in Pachahra, Mahoba, Uttar Pradesh. The site covers 10 acres.

Who is building it?

The applicant is Shivam Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Aug 2023), as of 27 Nov 2026.

Where is it?

In Pachahra, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹87 lakh and a site of 10 acres.

When was it filed?

The application was filed on 26 Aug 2023.

Project details

StatusEnvironmental approval granted
Status since26 Aug 2023
Application filed26 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantShivam Singh
Land area10 acres (4.1 ha)
Project cost₹87 lakh
Village / localityPachahra
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01193

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 26 Aug 2023 (this page)Environmental approval granted10 acres₹87 lakh
Early planning filed 24 Jan 2023Cleared for impact study10 acres₹87 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 10 acres, this one is larger than 96% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 21.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.

Where it is

Pachahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Shivam Singh in Mahoba

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.