What is Developing? Open the mapMap

Environmental approval grantedMining · Mahoba, Uttar Pradesh

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 453/1 , Village- Damaura, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.755 ha.)

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 453/1 , Village- Damaura, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.755 ha.) is an approved mining project in Pachahra, Mahoba, Uttar Pradesh. The site covers 11.8 acres. Its stated project cost is ₹99 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 16 Aug 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 453/1 , Village- Damaura, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 4.755 ha.) is an approved mining project in Pachahra, Mahoba, Uttar Pradesh. The site covers 11.8 acres.

Who is building it?

The applicant is Atique Ahmed.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 16 Aug 2023), as of 27 Nov 2026.

Where is it?

In Pachahra, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹99 lakh and a site of 11.8 acres.

When was it filed?

The application was filed on 16 Aug 2023.

Project details

StatusEnvironmental approval granted
Status since16 Aug 2023
Application filed16 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAtique Ahmed
Land area11.8 acres (4.8 ha)
Project cost₹99 lakh
Village / localityPachahra
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01264

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 16 Aug 2023 (this page)Environmental approval granted11.8 acres₹99 lakh
Early planning filed 25 Jan 2023Cleared for impact study11.8 acres₹99 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.8 acres, this one is larger than 98% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 21.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.

Where it is

Pachahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.