Quick answers
What is this project?
"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Araji No.- 01 (Khand No.- 07), Village- Baghawa, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 2.024 ha.) is an approved mining project in Kabrai Nagar, Mahoba, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Shri Somesh Bharadwaj Mahoba.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Sept 2023), as of 27 Nov 2026.
Where is it?
In Kabrai Nagar, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹78 lakh and a site of 5 acres.
When was it filed?
The application was filed on 27 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Sept 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri Somesh Bharadwaj Mahoba |
| Land area | 5 acres (2 ha) |
| Project cost | ₹78 lakh |
| Village / locality | Kabrai Nagar |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Taluk / tehsil |
| Our reference | WID-UP-01338 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Sept 2023 (this page) | Environmental approval granted | 5 acres | ₹78 lakh |
| Early planning filed 29 Nov 2022 | Cleared for impact study | 5 acres | ₹78 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is larger than 73% of them.
Where it is
Kabrai Nagar, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL… — forest land use approved, 0 m away
- Four Laning of MP/UP Border near Kaimaha check post to Kabrai section of NH-34… — forest land use approved, 500 m away
- 37 Nos. Court and other allied buildings for Integrated Court Complex — environmental approval granted, 3 km away
- 37 Nos. Court and other allied buildings for Integrated Court Complex — lapsed, 3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 4.2 km away
- Proposed District Jail complex (990 capacity) at Mahoba, Uttar Pradesh — environmental approval granted, 4.7 km away
- Rob at Km. 168+231 on NH-76 With Approaches in the State of Uttar Pradesh on… — more information requested, 5 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.